The following actions comprise Step 3 of the package operation – Cleaned Sand Discharge. These steps accompany the following graphic.
- Stop discharge flow to caisson
- Stop utility water flow to eductor
- Stop slurry flow to eductor
- Introduce clean utility water to accumulator through cyclonic jetting device until accumulator is filled
- Stop utility water flow to cyclonic jetting device
- Open valves to slurry cyclone
- System is ready to receive next batch of oil-sand slurry from primary processing